Estimation of the design flood of Tecolutla River, Mexico, using the probable maximum rainfall

Main Article Content

Domitilo Pereyra Díaz

Abstract

The design flood in a large catchment area was estimated for the probable maximum rainfall (pmp). The instant unit hydrograph model was used. The daily pmp that may occur in 1000 years on the watershed of the Tecolutla River, Mexico, was estimated by extreme values. The model forecasts a peak flow of 31,627.7m3/s at El Remolino, Veracruz.

Article Details

How to Cite
Pereyra Díaz, D. (1993). Estimation of the design flood of Tecolutla River, Mexico, using the probable maximum rainfall. Geofisica Internacional, 32(1), 35–39. https://doi.org/10.22201/igeof.00167169p.1993.32.1.1150
Section
Article